PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg Started installing rebar at Elev. 4-Stair -2 Facing South-West (800x600).jpg Welding beam connections at Monumental Stairs column Facing South -2 (800x600).jpg Welding beam connections at Monumental Stairs column Facing South (800x600).jpg Conduit by the Administration building (800x600).jpg Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600).jpg Installed manhole by the administration building (800x600).jpg
Previous pageNext page Welding beam connections at Monumental Stairs column Facing South -2 (800x600)
Welding beam connections at Monumental Stairs column Facing South -2 (800x600)